Long Drive Culvert Replacement

Project Update

Construction was complete on this project in October of 2021.  

 

About the Project

The city replaced an existing drainage pipe that collapsed in the public right of way. The pipe failure undermined the road shoulder and embankment causing a serious safety hazard to the traveling public. The project replaced the undersized stormwater pipe with a larger pipe to provide more capacity and an adequate drainage system. The project also repaired other affected public infrastructure such as pavement and utilities.

Project Details

 

Project Type:              Drainage Improvement

Project Budget:           $870,000

Design Engineer:        City 

Contractor:                  Charles D. Lowder, Inc.

 

Schedule

 

Date 

Activity

Fall 2020

Project Design Begins

Spring 2021

Project Design Complete

Summer 2021

Construction Start

Fall 2021

Construction Completed

 

Contact Us

For more information on this project, email Mr. Todd M. Love, City of Winston-Salem Stormwater Division, or call 336-734-1318.