Lynhaven Drive Drainage System Replacement

Project Update

Construction update: City Council awarded the construction contract and construction is scheduled to begin by September 2023.


December 2022: The project’s design is almost complete, and a bid schedule is being prepared. Once construction bids are received and approved by City Council then construction can move forward. Construction is anticipated for summer of 2023. Please note that there could be delays related to material availability.

 

About the Project

The City is planning to replace the storm drainage system in Lynhaven Drive located between Burke Ridge Ct. and Pine Ridge Drive. The pipes were failing and collapsing in the public right of way undermining the road and causing a road safety hazard. After inspection, approximately 800 feet of corrugated metal drainage pipe have failed bottom sections and have met the end of their functional life. This project will remove and replace the failing storm drainage pipe, repair asphalt paving of the road and other appurtenances within the public right of way.

Project Details

 

Project Type:              Drainage Improvement

Project Budget:           $700,000

Design Engineer:        City 

Contractor:                  To be determined

 

Schedule

 

Date 

Activity

Summer 2022

Project Design Begins

Winter 2022

Project Design Complete

     September 2023

Construction Start

To be determined

Construction Completed

 

Contact Us

For more information on this project, email Mr. Todd M. Love, City of Winston-Salem Stormwater Division, or call 336-734-1318.