January 2024:    The project’s design is ongoing with the final plan development submittal anticipated in March of 2024The road currently remains closed to traffic. 

 

About the Project 

The City was notified about a sinkhole forming under the sidewalk adjacent to the large culvert structureAfter investigation, it was determined that a sinkhole had formed at the headwall around the structure. The stone headwall had severe cracking and was separating from the culvert pipe. A culvert condition inspection and assessment recommended replacement of the aging infrastructure. This project will replace the existing metal culvert structure with a larger structural arch metal box culvert. Other road improvements such as pavement, concrete curb and sidewalk will be repaired and restored as part of the projectThe project will also install guardrail for safety and repair other affected public infrastructure such as utilities. 

Project Details 

Project Type:        Roadway and Drainage Improvement Project 

Project Budget:    $2,000,000 

Design Engineer:    HDR Engineering of the Carolinas, Inc. 

Contractor:        To Be Determined 

 

Schedule 

 







Date  






Activity 






Summer 2023 





Project Design started 






Anticipated Spring 2023 





Project Design Complete 






To Be Determined 





Construction Start 






To Be Determined 





Construction Completed 

 

Contact Us 